Renewables

Cantonal government moves on EUR 61.3 million wind farm project

Photo: vladausk.ba

Published

January 9, 2019

Comments

comments icon

0

Share

Published:

January 9, 2019

Comments:

comments icon

0

Share

The government of the Una-Sana Canton has authorized Prime Minister Mustafa Ružnić to sign an agreement with Croatia’s Ivicom Consulting, part of Austria’s Ivicom Holding, concerning a project to build a wind farm in the Bihać area.

The wind farm is to be built under an investment of around BAM 120 million (some EUR 61.3 million), said Ružnić, adding that he is pleased the government has launched activities to enable the project’s realization.

According to a press release from the cantonal government – one of 10 in the entity of the Federation of Bosnia and Herzegovina (FBiH) – the agreement is to regulate the parties’ relations concerning a change to the draft contract on the award of a concession to use construction land to build and operate wind turbines, each with a capacity of up to 5 MW, at the Teočak locality.

The agreement is designed to protect the canton legally and financially should courts in Bosnia and Herzegovina (BiH) annul the concession, according to the press release.

The initial steps concerning the concession were taken back in 2016, according to earlier reports.

Other projects in the region

Ivicom Holding has a number of wind and other energy projects in the region.

In 2018, it signed a memorandum of understanding (MoU) with Montenegro’s power utility Elektroprivreda Crne Gore (EPCG) concerning the implementation of a project to build the Gvozd wind farm with a planned capacity of 50 MW, under an investment estimated at around EUR 70 million.

Ivicom was also involved in Montenegro’s Krnovo wind farm project. The 72 MW Krnovo wind farm, built by France’s Akuo Energy and Ivicom, started operating in November 2017. The United Arab Emirates’ (UAE) renewable energy company Masdar has since signed an agreement with Akuo to buy a 49% stake in Krnovo Green Energy, which operates the onshore wind farm.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

IRENA La Camera renewables must grow higher speed scale

IRENA’s La Camera: Renewables must grow at higher speed, scale

12 July 2024 - IRENA's Director-General Francesco La Camera warned of ongoing patterns of concentration in geography in renewables deployment as well as against complacency

green steel electric vehicles study transport environment

Switching to green steel would add just EUR 8 per electric vehicle by 2040

11 July 2024 - Switching to 40% green steel would add just EUR 57 to the sticker price of an electric vehicle in 2030, according to an analysis by T&E

Albania declares eight winners at 300 MW solar power auction

Albania declares eight winners at 300 MW solar power auction

10 July 2024 - The lowest bid at Albania's solar power auction came in at EUR 39.7 per MWh, against a starting level of EUR 59.97 per MWh

Serbia digitalizes permitting energy sector

Serbia digitalizes permitting in energy sector

10 July 2024 - Serbia rolled out digital services for energy permitting and the procedure for environmental impact assessment studies