Renewables

Statkraft seeks afforestation services provider

Published

June 22, 2015

Country

Comments

0

Share

Published:

June 22, 2015

Country:

Comments:

0

Share

Devoll Hydropower Sh. A. (DHP), Albanian company ultimately owned by the Norwegian company Statkraft AS, closed its invitation for expression of interest or prequalification for afforestation services as the deadline expired on June 22. The endeavour in Banje hydropower plant area, part of Devoll project, covers 255.3 hectares in five sections and includes maintenance of standard forest species, the company’s website said.

On June 8, Statkraft hired Norwegian SediCon for the delivery of dredging equipment to the Devoll hydropower plant in Albania, Dredging News Online (Sandandgravel.com) said. The Devoll River is 15 kilometers long and feeds a 390 million cubic metres reservoir. The river carries large sediment loads and the reservoir is expected to lose about 5 million cubic metres of its volume per year. In order to avoid storage loss, SediCon will provide a dredge for 400 cubic metres per hour to a depth of 60 metres, the report said.

Devoll project consists of two plants – Banja and Moglicë, to be built in the valley, with an installed capacity of 256 MW. The power plants will produce 729 GWh annually, increasing the Albanian electricity production by almost 17 per cent, Devoll’s website says.

Licenses for the construction and use of 30 power plants throughout Albania were cancelled by the country’s government for their „failure to meet obligations,“ after members of the European Parliament called on it to reconsider the plans.

The liberalisation and integration of the Albanian electricity market has been slower than expected, Devoll’s director of governmental affairs Agnar Aas had said in October, during a presentation at an industry event on Tirana, petrochemical market information provider ICIS reported.

Tags:

Related Articles

rheenergise-high-density-hydro

RheEnergise building waterless hydropower storage facility in UK

06 May 2024 - RheEnergise has developed a technology to use a dense fluid rather than water to store surplus energy from wind and solar power plants

europe flexibility seasonal balancing iea report

Flexibility needs to be met by demand response, batteries, hydrogen, but also thermal, hydropower plants – IEA

03 May 2024 - The report Managing the Seasonal Variability of Electricity Demand and Supply analyzes the situation in Europe, India, and Indonesia

IPTO suspends all electricity imports until May 7 to protect the Greek system

Greece suspends electricity imports until May 7 to protect system

03 May 2024 - The Greek Independent Power Transmission Operator (IPTO) has announced the suspension of all electricity imports during the hours around noon

Two agrosolar power plants are planned to be constructed in Serbia

Two agrisolar projects launched in northern Serbia

02 May 2024 - In the vicinity of Kikinda in Serbia, two new agrisolar projects are underway: Solar Power Plant Delta and Brankov solar