Renewables

UNDP tender for photovoltaic system in Macedonian village of Hamzali

Slika: Pixabay

Published

October 16, 2017

Country

Comments

comments icon

0

Share

Published:

October 16, 2017

Country:

Comments:

comments icon

0

Share

The UNDP Country Office in the former Yugoslav Republic of Macedonia has published a tender for Procurement and installation of grid-connected photovoltaic system in village of Hamzali.

UNDP invites interested companies to submit offers in a sealed envelope not later than 25 October 2017 at 10:00 at the address of UNDP. More details can be found in the Request for quotation document and Annex 4 – Drawing and location.

The subject of tender are design of the grid-connected photovoltaic rooftop system with installed capacity of 40 kWp, delivery of the 250 Wp PV modules and 20 kW three-phase inverters, installation, designer supervision, setting, testing, commissioning and service, the UNDP said in a statement.

The winner will have maximum 2 months upon signing of contract for completion for delivery and installation works and must provide services support within maximum 10 days upon request within the warranty period.

Village of Hamzali is in the Municipality of Bosilovo which is located in the south-east of the country.

 

Comments (0)

Be the first one to comment on this article.

Enter Your Comment

Related Articles

envision green hydrogen ammonia

China-based Envision opens world’s largest green hydrogen, ammonia plant

14 July 2025 - The plant can deliver 320,000 tons of green ammonia per year, with annual output projected to rise to 1.5 million tons by 2028.

hydrogen lab gas research

Balkan hydrogen scientists: Research funding should focus on real-world applications

14 July 2025 - A team of scientists from Slovenia, Serbia, and Bosnia and Herzegovina is working on a hydrogen project based on seawater electrolysis.

Serbia EPS starts trial operation of its Petka PV plant on coal tailings dump

Serbia’s EPS starts trial operation of its Petka PV plant on coal tailings dump

14 July 2025 - EPS connected its first larger solar park, called Petka, to the grid. The new facility is in its coal complex Kostolac.

GGF grows direct lending energy transition energy security

GGF grows direct lending, committed to energy transition, energy security

11 July 2025 - In its Impact Report 2024, Green for Growth Fund outlined powering the green transition across Southeast Europe, the Caucasus and beyond