Renewables

German VE Grebak plans to build windfarm in Nevesinje area

Photo; www.vladars.net

Published

May 23, 2017

Comments

comments icon

0

Share

Published:

May 23, 2017

Comments:

comments icon

0

Share

Republika Srpska Minister of Industry, Energy and Mining Petar Đokić lent his support to an initiative to build a windfarm in eastern Herzegovina. Đokić told representatives of the German company VE Grebak that the area is suitable because it has the right climate conditions for wind power generation.

The windfarm which the Grebak company is planning to build will have 49.5 MW of installed capacity and will produce about 130 GW of electricity a year. The total investment is estimated to stand at EUR 65 million and the project should be completed within the next two years.

Đokić met with VE Grebak and Nevesinje municipal officials in Banja Luka. He told them that the construction of the windfarm should be viewed as a development opportunity for the municipality, adding that the investment is significant not only because of new jobs but also because the necessary infrastructure will be built along with the windfarm.

VE Grebak company officials said that they have extensive experience in building wind-powered energy facilities and added that the they plan to invest technical resources along with finances in the project.

CEO of the VE Grebak local branch in Mostar Miralem Čampara said that the construction of the windfarm will stimulate the entire local economy in Nevesinje because local companies will be engaged on the project.

VE Grebak head office spokesman Erich Preisler and local branch official Admir Rahmić made a presentation of the construction plans during the meeting with Minister Đokić.

The Grebak windfarm is the second wind power project in the Nevesinje municipality. The British company Kermas is investing an estimated EUR 75 million in the construction of a wind power facility on the Trusina mountain which is due to become operational by the end of this year.

Both state entities in Bosnia-Herzegovina have drawn up action plans with the aim of increasing the amount of power generated by windfarms. The BiH Federation plans to reach the level of 43 MW of installed capacity while the Republika Srpska plans to reach 100 MW by the year 2020.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

serbia eu region bef 2026 grid flexibility panel

Renewable energy ambitions must include ways to ensure grid integration

22 May 2026 - Market participants in the region have differing views of the current state of the grid, according to a panel held at Belgrade Energy Forum 2026

Greece PPC Group raises EUR 4.5 billion in capital offering

Greece’s PPC Group raises EUR 4.5 billion in capital offering

22 May 2026 - Public Power Corp. conducted a historic share capital increase of EUR 4.5 billion. The government and existing stockholder CVC covered 55.6%.

DRI operating licence for Văcărești solar park in Romania

DRI gets operating licence for Văcărești solar park in Romania

22 May 2026 - DRI has received the commercial operating license for its 126 MW Văcărești solar park in Dâmbovița county near Bucharest

SANY Renewable Energy Alibunar wind parks Serbia end June 2026

SANY Renewable Energy to start building Alibunar wind parks in Serbia by end-June

22 May 2026 - SANY Renewable Energy has signed agreements with contractors for its wind power projects Alibunar 1 and 2 in northeastern Serbia