EPS invites tenders for construction of two small HPPs
Public power utility Elektroprivreda Srbije has invited tenders for the construction of two new small hydropower plants (HPP) Ćelije HPP, near the City of Kruševac, and Rovni HPP, near the City of Valjevo, on existing dams. The investment is part of the Programme for Reconstruction of Small Hydropower Plants for which EPS received a EUR […]
World Bank provides technical assistance to Serbia for more efficient EPS
The World Bank will provide technical assistance to the Government of Serbia to improve the performance of the Serbian power utility Elektroprivreda Srbije (EPS). The agreement on providing Reimbursable Advisory Services (RAS) to EPS was signed by Cyril Muller, World Bank Regional Vice President for Europe and Central Asia, and Dušan Vujović, Serbian Minister of […]
Elektroprivreda Srbije looks for Kostolac wind farm advisor
Public power utility Elektroprivreda Srbije (EPS) seeks a consultant for the construction of the 66 MW Kostolac wind farm. The state-owned company published a public call for the expressions of interest from consulting firms to assist in the preparation of the Kostolac wind farm project. This will be the first renewable energy capacity in EPS’ […]
EPS to hire consultant for new ash handling system in TPP Nikola Tesla
Public power utility Elektroprivreda Srbije (EPS) has invited expressions of interest from consultants for the project Modernization of the Ash Handling System in the Thermal Power Plant (TPP) Nikola Tesla A in Obrenovac project. TPP Nikola Tesla A is the biggest thermal power plant in Serbia with a capacity of 1,650 MW and the biggest […]
World Bank’s loan to support electricity supply tariff rises in Serbia
World Bank (WB) EUR 160.6 million loan provided to Serbia will, among other activities, support public power utility Elektroprivreda Srbije (EPS ) in achieving increased convergence of the guaranteed electricity supply tariff to reach market parity levels. The percentage and the date of the electricity price hike are not determined. According to World Bank’s statement […]
EPCG inks deal for HPP Komarnica preliminary design plan
Montenegro’s electricity company Elektroprivreda Crne Gore (EPCG) has signed an agreement worth over EUR 1.6 million with a group of bidders from Serbia – Jaroslav Černi and Energoprojekt Hidroinženjering – to produce a preliminary design plan for hydropower plant (HPP) Komarnica. The contractors are also to prepare a feasibility study and an environmental impact study, EPCG has […]
HPP Zvornik’s green electricity generation hits daily record as capacity is increased by 15 MW
Two revitalized units of hydroelectric power plant (HPP) Zvornik have been officially put into operation, in what increased the plant’s installed capacity by 15 MW and its life expectancy by 40 years. The well-executed overhaul was demonstrated by the fact that on the first day of the modernized A2 unit’s test run, Zvornik reported a […]
Serbian power utility EPS presents Environmental Action Plan, to invest EUR 864 million
The Draft Environmental Action Plan of public power utility Elektroprivreda Srbije (EPS) from 2016 to 2025 anticipates investments of EUR 864 million in reducing air, soil and water pollution, as well as in waste management, Aleksandar Jakovljević, head of strategy at EPS’ said during a presentation of the Draft Action Plan. He recalled that in […]


