Renewables

Spain gets Europe’s lowest wind energy price with CfD auction model

wind-energy-auctions-CfD-Spain-price

Photo: Pixabay/enriquelopezgarre

Published

January 28, 2021

Country

Comments

comments icon

0

Share

Published:

January 28, 2021

Country:

Comments:

comments icon

0

Share

Spain has auctioned a total of 3 GW of renewable energy capacity under the country’s new auction design, the Contracts-for-Difference (CfD) model, resulting in the lowest ever price for new onshore wind energy in Europe, of EUR 20 per MWh, according to WindEurope.

The CfD model brings the lowest prices for renewables because it minimizes the financing costs of new projects. CfDs are cheap for governments, as governments get paid back as well as paying out. In this way, citizens win twice, both as consumers and taxpayers, according to WindEurope CEO Giles Dickson.

CfDs are cheaper for both governments and consumers than other incentive schemes

With CfDs, a model advocated by WindEurope, wind farms pay back when the market price exceeds the auction price, while governments only pay out when the market price is lower than the auction price, making CfDs cheaper for governments and consumers than other support schemes.

Awarded projects in Spain may opt to sign PPAs after selling defined amounts

In the January 21 auction, successful bids are awarded 12-year CfDs. Awarded projects must sell a defined amount of electricity to the market under the CfD contract, but once the threshold is reached, they can either opt to continue selling their electricity under the CfD or, for example, sign corporate renewable power purchase agreements (PPAs) with industrial customers.

Wind projects awarded 1 GW, with at least 1.5 GW more to be auctioned in 2021

The January 21 auction comprised three separate pots – 1 GW of wind energy capacity, 1 GW of solar PV, and another 1 GW for all renewable energy sources combined. The wind energy was awarded a total of 1 GW, whereas the technology-neutral pot went completely to solar. The wind bids ranged from EUR 20 per MWh to EUR 28.89 per MWh.

The Spanish government will auction 1.5 GW annually between 2021 and 2025 under the wind-only pot. Wind Europe also recalled that the January 21 tender for 3 GW was a delayed 2020 tender, meaning that Spain will hold another auction for at least 1.5 GW MW of wind energy in 2021.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Hidroelectrica spearheading next wave BESS Romania Simtel Guris Econergy

Hidroelectrica spearheading next wave of BESS investments in Romania

21 April 2026 - Electricity producers in Romania are investing in several gigawatts of battery storage – for hybrid power plants or standalone systems

Turkish solar panel manufacturers expanding global presence CW Enerji Smart Solar Technologies

Turkish solar panel manufacturers expanding global presence

20 April 2026 - CW Enerji has a provisional USD 750 million deal in the US for its PV modules, while solar panel producer Smart Solar Technologies obtained a global certificate

astronergy solar park romania

Chinese Astronergy commissions 31 MW solar park in Romania, plans 14.4 MW BESS

20 April 2026 - Astronergy Solar has begun commercial operation of a 31 MW solar power plant in Romania and plans to build a 14.4 MW battery system

Wilhelmshavn roman bernard battery system BESS NGEN Uniper Germany

NGEN, Uniper break ground on 100 MWh battery system in Germany

17 April 2026 - The battery system in Wilhelmshaven will balance wind and solar power, supporting grid stability and renewables integration