Electricity

Republika Srpska government proposes new energy sector development strategy until 2035

Photo: Republika Srpska government

Published

June 12, 2018

Comments

comments icon

0

Share

Published:

June 12, 2018

Comments:

comments icon

0

Share

The government of Republika Srpska, the Serb entity of Bosnia and Herzegovina, has adopted a proposal of the energy sector development strategy until 2035, focusing on the security of supply and the creation of a sustainable and competitive energy sector, local media reported.

The document, which has been sent to parliament for a fast-track procedure, is essentially a revision of the previous energy sector development strategy, passed in March 2012, but it was drawn up as an entirely new document, with the timeframe extended from 2030 to 2035, according to reports.

Among the five key objectives of the new strategy is a more efficient exploitation of energy resources, which involves identifying and mapping the capacities in all segments of renewable energy sources, creating conditions for the use of new, innovative technologies, modernizing the coal sector, and stepping up the exploration of the virtually untapped oil and natural gas potentials, according the final draft of the strategy, available on the government’s website.

Another objective is to ensure the security of supply and accessibility of energy, which entails the diversification of supply routes and the further physical integration of the electricity and gas market with countries in the region, with a focus on Serbia, according to the final draft.

The strategy also envisages improving energy efficiency, reducing emissions, controlling the quality of oil products supplied on the domestic market, and harmonizing the regulatory framework with existing and future obligations towards the EU, according to the draft.

According to reports, energy prices in Republika Srpska are relatively low compared with countries in the region and the EU, and the government will seek to maintain such a policy in the future.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Montenegro NECP public consultation sole coal plant shutdown 2041

Montenegro publishes NECP for public consultation – sole coal plant planned for shutdown in 2041

30 June 2025 - The retirement of the Pljevlja coal plant is planned for 2041, but it depends on a just transition and supply security, the draft NECP reads

LONGi ignites Romania energy transition 54 1 MW BC

LONGi ignites Romania’s energy transition with 54.1 MW BC technology triumph

30 June 2025 - A PV plant in Romania's northwest is on schedule for a grid connection in the fourth quarter. It features LONGi Solar's BC modules.

Fortis Energy Albania 62 MW solar power

Fortis Energy gets green light in Albania for 62 MW solar power project

27 June 2025 - Fortis Energy received approval from the Albanian government for the construction of a 62 MW solar power plant in the country's southeast

Hidroelectrica construction pilot floating photovoltaic plant

Hidroelectrica to begin construction of its pilot floating photovoltaic plant

27 June 2025 - Romanian state-owned hydropower plant operator Hidroelectrica picked the contractor for a 10 MW floating solar power plant, its first