The Administrative Court in Split accepted Association BIOM’s law suit and declared invalid the decision of Croatia’s Ministry of Environmental and Nature Protection to accept the construction of Bila Ploča wind power plant in Pelješac peninsula in the country’s south. This is the first ruling which blocks a project in an area significant for bird protection as it has been determined that the environmental impact assessment study was unfounded, BIOM said. According to its press release, studies have been produced unprofessionally for years, including findings related to the Natura 2000 network.

The process was initiated by the association and the Croatian Society for Bird and Nature Protection three years ago and the court issued the ruling on December 28. The situation with the study was absurd as state institutions had identified the area as significant for bird protection on an international level, said Vedran Lucić, spokesman of BIOM, and added that bad positioning of wind power plants can cause high mortality of birds and bats, as they collide with turbine blades.

Unfounded studies are the consequence of direct deals between investors and producers of the document, and the ministry tolerates actions against protected species and habitats in Croatia, the press release said. BIOM has three more pending law suits related to bird protection, for wind parks in the mountains of Dinara and Velebit.

Related Articles

Brent oil on track for highest ever monthly jump in March

Brent oil on track for highest-ever monthly jump in March

31 March 2026 - The Middle East war shook the oil market, with the benchmark Brent crude oil price spiking more than 55% since the end of February

north macedonia energy renovation public buildings afd giz bozinovska

North Macedonia to invest EUR 50 million in energy renovation of public buildings

31 March 2026 - The Ministry of Energy, Mining and Mineral Resources started preparations for investments in the energy renovation of public buildings

How to choose a BESS integrator for utility-scale solar projects

31 March 2026 - Solar developers need to consider four main factors when selecting the integrator for a battery energy storage system (BESS)

NGEN Group Austria Europe largest energy storage

NGEN Group breaks ground in Austria for one of Europe’s largest energy storage facilities

31 March 2026 - NGEN Austria has launched works on a two-hour BESS of 85 MW in Wagenham, set to become the biggest in the country and one of the biggest in Europe