Renewables

Hungary’s Electron Holding plans solar power plants of up to 160 MW in Serbia

Electron Holding serbia solar subotica

Photo: Dieter Ludwig Scharnag

Published

April 8, 2024

Country

Comments

comments icon

0

Share

Published:

April 8, 2024

Country:

Comments:

comments icon

0

Share

Hungarian energy company Electron Holding plans to build solar power plants with a total capacity of up to 160 MW in the vicinity of Subotica, a Serbian city located close to the border with Hungary.

The photovoltaic plants should be installed on plots of land west and southwest of Subotica, near the villages of Šebešić and Mala Bosna.

In a step towards the implementation of the projects, the Subotica city assembly has adopted a decision on producing a detailed zoning plan for the construction of solar power plants with a total capacity of up to 160 MW in the cadastral municipality Donji Grad.

The Hungarian company has set up four firms in Subotica

The power plants should be built by Electron Energy Alpha, whose owner is Hungarian company Electron Holding, Politika reported.

Of note, Electron Holding recently received a concession for the 100 MW Seline solar project in Bosnia and Herzegovina. The concession contract was signed by Insolar, a subsidiary of the Hungarian company.

According to data from the Serbian Business Registers Agency, in addition to Electron Energy Alfa, the Hungarian company has set up three more firms in Serbia – Electron Energy Beta, Electron Energy Gamma, and Electron Energy Delta. All four are based in Subotica.

The photovoltaic project may include energy storage

In the decision adopted by the Subotica city assembly, the PV facilities would be installed over 164 hectares of second-class land.

The project envisages building several independent solar power plants with electricity storage on agricultural land, according to the decision.

Of note, Subotica should also be home to the Maestrale Ring wind project, which would be among the largest onshore wind farms in Europe.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

bih republic of srpska hydropower plants bistrica tunnels petar djokic

Three hydropower plants on Bistrica river to be finished by end-2026

18 April 2025 - Chinese company AVIC is in charge of building the three hydropower plants on the Bistrica, with a total capacity of 39 MW

albania france kesh afd drin hydropower energy storage

Albania’s KESH, France’s AFD sign MoU on hydropower management, energy storage 

18 April 2025 - KESH and Agence Française de Développement have signed an MoU on the Drin cascade management and advanced energy storage planning

bih federation ephzhb court poklecani urban permit arhaus

Supreme Court of Federation of BiH annulls urban permit for Poklečani wind farm

17 April 2025 - The project is being developed by Elektroprivreda HZHB, one of the three state-owned power utilities in Bosnia and Herzegovina

Minister Admir Sahmanović formally assumes energy, mining portfolio in Montenegro

Minister Admir Šahmanović formally assumes energy, mining portfolio in Montenegro

17 April 2025 - Minister of Energy and Mining of Montenegro Admir Šahmanović was formally voted in as the two ministries that he ran were merged