Romania

Handanovic Romania Serbia advance cooperation gas hydropower sectors

Romania, Serbia to advance cooperation in gas, hydropower sectors

18 January 2024 - Minister of Mining and Energy of Serbia Dubravka Đedović Handanović spoke with her Romanian counterpart Sebastian Burduja

NextE-largest-onsite-corporate-solar-PPA-Romania

NextE signs largest onsite corporate solar PPA in Romania

17 January 2024 - Renewables developer nextE signed a long-term corporate PPA for an 51.5 MW onsite project with an unidentified consumer

Global-players-bid-replace-coal-455-MW-solar-power-Romania

Global players bid to replace coal with 455 MW of solar power in Romania

15 January 2024 - Tenders for 455 MW of PV capacity replacing CE Oltenia's coal plants drew investors from China, Turkey, the US, Germany and Ukraine

Rezolv Energy biggest solar power plants Bulgaria Romania

Rezolv Energy advances projects for biggest solar power plants in Bulgaria, Romania

11 January 2024 - Rezolv received a green light in Bulgaria for a 229 MW solar park. In neighboring Romania it is building a 1.06 GW PV system.

omv petrom Electrocentrale Borzesti renovatio solar wind

OMV Petrom buys 400 EV chargers, half of 1 GW renewables project portfolio

09 January 2024 - OMV Petrom plans to invest approximately EUR 1.3 billion in renewables in Romania with Renovatio through a newly formed partnership by 2027

Subsidies-Romania-solar-panels-are-installed-last-roof

Subsidies in Romania should last until solar panels are installed on last roof

08 January 2024 - Minister of Environment Mircea Fechet says subsidy schemes in Romania should last until there are solar panels on every roof

Nofar Energy orders solar panels EUR 76 6 million Romania

Nofar Energy orders solar panels for EUR 76.6 million for Romania

03 January 2024 - Nofar Energy will equip its photovoltaic projects in Romania with LONGi Solar's panels with a total capacity of 576 MW

romania prosumers record cernavoda

Prosumers in Romania have installed capacity larger than Cernavodă nuclear power plant

02 January 2024 - The number of prosumers in Romania hit 100,000 in November while total installed capacity at the end of December is estimated at 1,400 MW

CCE Start-construction-three-utility-scale-solar-parks-Romania

Start of construction underway for three big solar parks in Romania

27 December 2023 - CCE Holding, ENGIE and PNE brought projects of 138.7 MW in planned peak capacity in Romania to a ready-to-build phase

Romania completes offshore wind power bill after severe delays

Romania completes offshore wind power bill after severe delays

22 December 2023 - The Parliament of Romania will debate the first offshore wind power bill at its next session, under an emergency procedure

Nofar acquires 255 MW solar power project in Romania

Nofar acquires 255 MW solar power project in Romania

21 December 2023 - Portland Trust has developed one of the largest photovoltaic projects in Romania and sold it to Israel-based Nofar Energy.

City Timisoara catches Romania solar power wave utility scale

City of Timișoara catches Romania’s solar wave with own utility-scale project

15 December 2023 - Timișoara intends to install a 5.6 MW photovoltaic park, which would generate enough electricity to cover two thirds of public lighting

transelectrica repower eu nrrp plan funds solar cyber security

Transelectrica secures EUR 56.2 million for solar, battery installations, cyber security upgrade

12 December 2023 - Transelectrica received the funds from the REPowerEU component of the National Recovery and Resilience Plan

romania deposit return system tomra

Romania introduces deposit refund system

04 December 2023 - The Romanian DRS is set to become the second-largest in Europe, and the world's largest centralized national DRS by volume of containers

Ruginoasa-wind-farm-romania-dtek

Ukrainian billionaire Akhmetov completes 60 MW Ruginoasa wind farm in Romania

28 November 2023 - The Ruginoasa wind farm, featuring Romania’s biggest wind turbines, is expected to start producing electricity next year

NextE-Romania-longest-corporate-PPA-solar-power-plant

NextE signs Romania’s longest corporate PPA for its solar power plant

24 November 2023 - A 7.4 MW photovoltaic system in Romania will supply a manufacturing facility under a PPA of a record 25 years, its developer nextE said

Page:
1 2 7 8 9 31 32