Electricity

North Macedonia to revitalize eight hydropower plants by 2026

Photo: Government of North Macedonia

Published

May 30, 2022

Country

Comments

comments icon

0

Share

Published:

May 30, 2022

Country:

Comments:

comments icon

0

Share

Prime Minister Dimitar Kovačevski announced a project to revitalize eight large hydroelectric power plants in North Macedonia by 2026. They cover 20% of the country’s total electricity production. The Mavrovo hydropower complex will increase its capacities, but it is necessary to calculate 2 GW from hydroelectric power plants for the country’s energy transition to renewable sources.

North Macedonia has “a serious domestic task” ahead of it when it comes to the transition to renewable energy sources, said Blagoj Gajdardžiski, director of development and investment of the state-owned company Elektrani na Severna Makedonija (ESM), at the NET 2022 symposium in Budva, RTCG reports.

He stated that about 2 GW of hydroelectric capacity should be built, and another 500 MW from the wind should be provided to replace the energy production coming from coal today.

In other news, Prime Minister Dimitar Kovačevski has just announced a project to revitalize eight ESM’s hydro power plants – Vrutok, Vrben, Raven, Tikveš, Caves, Globočica, Kozjak and Sveta Petka .

The installed capacity of these hydropower plants accounts for 85% of the total hydroelectric power in the country, and their average annual production is 1.28 TWh, which is 20% of the total electricity production in North Macedonia, the prime minister said.

The average annual production of eight hydroelectric power plants is 1.28 TWh per year or 20% of the country’s total electricity production

It is expected that the entire realization of the project last until 2026. Estimated funds for implementation amount to EUR 29 million. It will be secured by grants and soft loans, as well as by ESM’s funds, Kovačevski said.

Increasing the capacity of the Mavrovo hydro system

The announced revitalization project also includes the expansion of the Mavrovo accumulation capacity. That will provide an additional increase in electricity production by about 40 GWh per year, the prime minister said.

The projected increase in the performance of hydroelectric power plants will save 36.400 tonnes of CO2 emissions, Kovačevski said on the occasion of marking the 65th anniversary of the commissioning of the Vrutok hydroelectric power plant.

The Vrutok hydroelectric power plant has been operational since 1957 and, together with the hydroelectric power plants Vrben and Raven, form the Mavrovo hydro system.

Kovačevski noted that these eight hydropower plants are important for the management of the entire electricity system and its stability, voltage, and frequency regulation, as well as covering the daily spikes in the electricity consumption.

It should be noted that ecological organizations expressly oppose the construction of hydropower plants in protected natural assets, including the Mavrovo National Park.

Current projects in the energy transition

Prime Minister Kovačevski noted that ESM currently has 12 renewable projects at different stages of implementation.

ESM currently has 12 renewable projects at different stages of implementation

The Oslomej solar power plant, which will be built on the ground of a former mining site, will provide electricity for the needs of about 2,800 households. The project will recultivate 15 hectares of land, the prime minister said.

He recalled that North Macedonia would participate in the Liquefied Natural Gas (LNG) terminal project in Alexandroupolis, Greece, which would have a capacity of more than 5.5 billion cubic meters for storage and gasification.

Kovačevski also mentions that the Čebren hydroelectric power plant project has entered the second phase and that nine qualified potential bidders are inspecting the field. In the past 15 years, 13 tenders for the construction of the Čebren HPP on the Crna River have failed. The planned capacity of the hydroelectric power plant is 333 MW, while the investment cost is estimated at EUR 570 million.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Petrol obtains financing EV charging network Slovenia Croatia

Petrol obtains financing for EV charging network in Slovenia, Croatia

15 July 2024 - Slovenia-based Petrol is about to install electric vehicle charging points in 35 locations in its home market and in Croatia.

Green for Growth Fund financial impact targets 2023

Green for Growth Fund tops its financial, impact targets in 2023

15 July 2024 - The Green for Growth Fund kept mitigating climate change and promoting sustainable economic growth last year in its 18 markets

Energy permit not needed for power plants under 1 MW in BiH

15 July 2024 - The Ministry of Energy, Mining and Industry has adopted the rulebook on issuing energy permits and it entered into force on July 6

koncar croatia siemens energy

Končar, Siemens Energy launch new joint venture

15 July 2024 - Croatia’s firm Končar and Siemens Energy have signed a joint venture agreement on the establishment of the Končar - Transformer Tanks