Electricity

ERS selling electricity surplus via tenders

Published

May 25, 2016

Comments

comments icon

0

Share

Published:

May 25, 2016

Comments:

comments icon

0

Share

State-controlled power utility Elektroprivreda Republike Srpske (ERS) closed this year’s second call for applications in the sale of 59.28 GWh of electricity surplus.

The previous tender was for 31.92 GWh, both available for delivery between June 1 and June 19. Bids were placed for either the full amount or a portion – but not lower than 5 MWh. Offers had to cover the whole period of delivery, the company said in a public invitation posted on its website. The bidders had to provide bank guarantees for 3% of the value of the offer and the signing of contracts for approved lots is announced for May 27.

Last year, ERS signed contracts with five local and regional buyers for a total of 460.5 GWh of surplus electricity available for delivery in 2016.

The company based in Trebinje, operating installed capacity of 1.35 GW with an average annual production of 5 TWh, is the power utility of the Republic of Srpska, one of the two autonomous entities that form Bosnia and Herzegovina. The other is the Federation of BiH, where power utilities Elektroprivreda HZHB and Elektroprivreda BiH, the largest of the three, are based.

Tags: ,

Related Articles

romania INVL Renewable Energy Fund Kommunalkredit

INVL fund secures loan for 71 MW of solar projects in Romania

30 July 2025 - INVL Renewable Energy Fund I, managed by INVL Asset Management, invests in renewable energy projects

Price of residential battery storage in Europe drops over 50 in two years

Price of residential battery storage in Europe drops over 50% in two years

30 July 2025 - The mature residential battery storage markets in Europe are stabilizing, while policy-driven and emerging markets are gaining traction

Eximprod 38 4 MW wind farm northeast of Bucharest

Production starts at new 38.4 MW wind farm northeast of Bucharest

30 July 2025 - Eximprod started generating electricity in its new wind farm in Romania's east, while several other projects in the country are near completion

montenegro epcg nte energy norway memorandum bulatovic Inge Forseth

Montenegro’s EPCG, NTE Energy sign memorandum of understanding

30 July 2025 - The memorandum of understanding confirms mutual commitment to intensifying cooperation in the renewable energy sector in Montenegro