Electricity

Miroslav Tomašević appointed as acting CEO of Serbia’s power utility EPS

Miroslav Tomasevic EPS acting CEO TV Pink

Photo: TV Pink / printscreen

Published

March 3, 2022

Country

Comments

0

Share

Published:

March 3, 2022

Country:

Comments:

0

Share

Miroslav Tomašević replaced Milorad Grčić as the acting director of Elektroprivreda Srbije – EPS, Serbia’s state-owned coal and electricity producer.

The Government of Serbia named Executive Director for Electricity Generation Technical Affairs of EPS Miroslav Tomašević as the new acting director. The government-controlled company has been in turmoil since late last year due to a series of breakdowns and fires in its coal mines and thermal power plants.

The biggest incident happened on December 12 with the first snowfall. The two biggest thermal power plants, TENT A and TENT B, ceased production almost completely.

The combination of mud-laden coal and other factors lead to the collapse, which prompted EPS to turn to imports. At one moment, Serbia was covering 45% of its power consumption from abroad.

Criticized by President Aleksandar Vučić and the Government of Serbia, Grčić submitted his resignation almost two months ago, but he was still officially in charge in the meantime. He was appointed in 2016 and his term expired after one year, but he was left at the helm of the dominant power producer until now in breach of law.

Tomašević was one of the candidates in 2017 to become the permanent head of Serbia’s biggest company, but the government decided to leave Grčić at the helm. The new acting director earlier downplayed the severity of the December collapse in EPS and Serbia’s overall electric power system.

EPS is still suffering from low coal supply and quality, not least because one of the biggest and newest machines at its Kolubara open pits burned down on January 10, after which Grčić quit.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

europe flexibility seasonal balancing iea report

Flexibility needs to be met by demand response, batteries, hydrogen, but also thermal, hydropower plants – IEA

03 May 2024 - The report Managing the Seasonal Variability of Electricity Demand and Supply analyzes the situation in Europe, India, and Indonesia

drina-hydropower-plants

Court annuls environmental permit for Drina hydropower project

02 May 2024 - The construction of large hydropower plants on the Drina is facing new delays, after a court ruling to scrap the environmental permit for HPP Foča

el-dorado-electricity-imports-north-macedonia-rke

North Macedonia: ‘Solar El Dorado’ cuts electricity imports to 2.75%

02 May 2024 - In 2023, North Macedonia's new solar capacity increased by as much as 251% compared to 2022

EU-completing-Green-Deal-Industrial-Plan-Net-Zero-Industry-Act

EU completing Green Deal Industrial Plan as Net Zero Industry Act awaits go-ahead

01 May 2024 - The European Union's Net Zero Industry Act is about to come into force, completing legislative work within the Green Deal Industrial Plan