Electricity

Miroslav Tomašević appointed as acting CEO of Serbia’s power utility EPS

Miroslav Tomasevic EPS acting CEO TV Pink

Photo: TV Pink / printscreen

Published

March 3, 2022

Country

Comments

comments icon

0

Share

Published:

March 3, 2022

Country:

Comments:

comments icon

0

Share

Miroslav Tomašević replaced Milorad Grčić as the acting director of Elektroprivreda Srbije – EPS, Serbia’s state-owned coal and electricity producer.

The Government of Serbia named Executive Director for Electricity Generation Technical Affairs of EPS Miroslav Tomašević as the new acting director. The government-controlled company has been in turmoil since late last year due to a series of breakdowns and fires in its coal mines and thermal power plants.

The biggest incident happened on December 12 with the first snowfall. The two biggest thermal power plants, TENT A and TENT B, ceased production almost completely.

The combination of mud-laden coal and other factors lead to the collapse, which prompted EPS to turn to imports. At one moment, Serbia was covering 45% of its power consumption from abroad.

Criticized by President Aleksandar Vučić and the Government of Serbia, Grčić submitted his resignation almost two months ago, but he was still officially in charge in the meantime. He was appointed in 2016 and his term expired after one year, but he was left at the helm of the dominant power producer until now in breach of law.

Tomašević was one of the candidates in 2017 to become the permanent head of Serbia’s biggest company, but the government decided to leave Grčić at the helm. The new acting director earlier downplayed the severity of the December collapse in EPS and Serbia’s overall electric power system.

EPS is still suffering from low coal supply and quality, not least because one of the biggest and newest machines at its Kolubara open pits burned down on January 10, after which Grčić quit.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Principia CfD backed battery storage facility in Greece

Principia builds CfD-backed battery storage facility in Greece

15 October 2025 - Principia built its first BESS in just six months. The Themelio facility in Chalkidiki in northern Greece has 49 MW in operating power.

CEO Dejan Paravan leaving Slovenian state owned GEN energija report

CEO Dejan Paravan leaving Slovenian state-owned GEN energija – report

15 October 2025 - Dejan Paravan has resigned as Slovenian state-owned GEN energija's CEO and is joining NGEN, according to a news report

Šahmanović: Second submarine cable line with Italy to be installed by 2031

15 October 2025 - Minister of Energy and Mining Admir Šahmanović announced an investment at the EU-Montenegro Investment Conference

montenegro eu investment conference alcazar calderon bijela

Alcazar Energy plans to boost its Montenegro investments to USD 500 million

14 October 2025 - Alcazar Energy intends to increase its investments in Montenegro from USD 200 million to USD 500 million, says Daniel Calderon