Renewables

GE Renewable Energy to supply Cypress units for 51 MW wind farm in Turkey

GE Renewable Energy

Photo: GE Renewable Energy

Published

September 30, 2019

Country

Comments

comments icon

0

Share

Published:

September 30, 2019

Country:

Comments:

comments icon

0

Share

GE Renewable Energy has been selected by Sanko Enerji to supply GE’s 4.8 MW Cypress Units for the 51 MW Gazi 9 Wind Farm in Turkey and will be providing a 10-years Full-Service Agreement.

Located in Çanakkale, Turkey, the 51 MW wind farm will generate enough renewable energy to power the equivalent of 100,000 homes in Turkey and will play a significant role supporting the country’s renewable energy target, GE Renewable Energy said in a press release.

The construction of the wind farm is expected to begin during the fourth quarter of 2019, to reach commercial operation by the end of October 2020.

The Gazi 9 wind farm, being developed under a USD 65 million investment, will have an annual production of 230 million kWh, preventing 134,000 tons of carbon emissions, said a spokesperson for Sanko Energy, adding that with this agreement, Sanko Energy is one step closer to its goal of increasing its existing 725 MW all renewable energy installed capacity to 900 MW by the end of 2020.

Announced last year by GE Renewable Energy, the Cypress is the most powerful wind turbine in operation today, the company said. It enables significant Annual Energy Production (AEP) improvements, increased efficiency in serviceability, improved logistics and siting potential, and ultimately more value for customers. The two-piece blade design enables blades to be manufactured at even longer lengths and improving logistics to drive costs down and offer more siting options, in locations previously inaccessible.

As a part of the agreement, GE Renewable Energy will locally produce the wind turbine blades in LM Wind Power’s Bergama site, Izmir, Turkey, where GE has more than 450 employees. At the end of April 2019, the site started the construction of an extension, in order to set-up the factory to be prepared to produce the innovative two-pieces blade, set to be assembled to GE’s Cypress turbine. Towers will also be produced in the country.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Global battery storage capacity expands record 200 GWh 2024

Global battery storage capacity expands by record 200 GWh in 2024

29 May 2025 - The cost of storing electricity has dropped thanks to the declining cost of battery projects and technological advancements, Rystad says

CyberGrid is committed to energy transition in SEE with its aggregation solutions Candellari

CyberGrid is committed to energy transition in SEE with its aggregation solutions

28 May 2025 - CyberGrid's Nikolaj Candellari said at BEF 2025 that the firm believes in the energy transition in SEE, contributing to the process with its solutions

ACER Zinglersen Integrate electricity markets flexibility new era already here BEF 2025

ACER’s Zinglersen: Integrate electricity markets to bolster flexibility as new era is already here

28 May 2025 - The number of hours with negative power prices reached an all-time high for two years in a row, which means a new era is here, ACER's Director Christian Zinglersen said at BEF 2025

NGEN BEF 2025 decentralized electricity grid Roman Bernard BEF 2025

NGEN showcases solutions at BEF 2025 for decentralized electricity grid of tomorrow

28 May 2025 - Slovenia-based NGEN is expanding throughout Europe with its software platforms and equipment and BESS for decentralized grids