Renewables

TENDERING: Montenegro leasing land for wind farm on Brajići locality

Photo: Pixabay

Published

August 12, 2019

Country

Comments

comments icon

0

Share

Published:

August 12, 2019

Country:

Comments:

comments icon

0

Share

Montenegro’s Ministry of Economy has launched tendering for a long-term lease to state land for the construction of a wind farm with a minimum installed capacity of 70 MW on the Brajići locality in the municipalities of Budva and Bar.

The land on the Brajići locality spans 13,791,606 square meters. The minimum lease fee requested is EUR 0.05 per square meter annually during the 30-year lease period.

According to the invitation, which was initiated by the company Vjetroelektrana Budva, owned by wpd europe, eligible to bid are all legal entities and individuals, domestic or foreign, as well as consortia, meeting the following requirements:

  1. experience in the field of the construction of wind power plants with a cumulative installed capacity of at least 500 MW;
  2. experience in the implementation of wind power plant construction projects, and at least one wind power plant with an installed capacity of 50 or more MW;
  3. average annual gross income exceeding EUR 100 million or equivalent in another currency, over the last 3 financial years (2016, 2017, 2018).

The deadline to file bids expires at noon on October 11, 2019.

Montenegro’s renewables share of power generation tops 60%

Montenegro has two operational wind farms – Krnovo and Možura. The construction of the Gvozd wind farm is expected to begin in 2020.

In the last two years, Montenegro produced more than 60% of electricity from renewable energy sources, which is the result of a good investment environment and the inherited production infrastructure, Montenegro’s Economy Minister in charge of energy, Dragica Sekulić, said recently in an interview with Balkan Green Energy News.

The main sources of renewable power generation in the past period were the Piva and Perućica hydropower plants (HPPs), which were built in the 1960s and the 1970s, while as of this year, wind energy accounts for around 10% of power generation, Sekulić said.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Romania preparing to build giant AI hub data centers

Romania preparing to build giant AI hub, data centers

29 January 2026 - Romania is developing its Black Sea AI Gigafactory project, of up to EUR 5 billion, and several other investments in new technologies

montenegro TNC eco team mapping low-conflict solar wind potential

Montenegro identifies 16.3 GW of low-conflict solar and wind potential

29 January 2026 - The Montenegro Energy Growth and Acceleration project was implemented by The Nature Conservancy and Montenegrin NGO Eco-Team

Record battery installations EU 2025 Bulgaria enters top 3

Record battery installations in EU in 2025 as Bulgaria enters top 3

28 January 2026 - The European Union added 27.1 GWh of battery capacity last year, marking a 12th consecutive record – driven by utility-scale storage

croatia ante susnjar minister renewables subsidies jutarnji list energy conference

Šušnjar: Croatia allocated EUR 4 billion so far to boost renewables; subsidies for wind, solar to end

28 January 2026 - Minister of Economy Ante Šušnjar said at an energy conference that the money could have been put to better use