News

Mecasolar supplies 1 MW in 2-Axis trackers

Published

May 27, 2015

Comments

comments icon

0

Share

Published:

May 27, 2015

Comments:

comments icon

0

Share

A new solar project in Miroslava, 400 kilometres north of Bucharest, has been powered with 97 dual axis trackers produced by Mecasolar (Mecanizados Solares SL) from Fustiñana, Spain, the company said in a press release. One of the biggest photovoltaic power plants in the country will be connected to the grid at the end of June, the company said.

The power plant, which is expected to have an annual solar power output of 1.7 GWh and to save 850 tons of carbon-dioxide equivalent emissions, features 97 of 10.31 kW 2-Axis trackers and more than 4,170 photovoltaic modules. The devices are capable of increasing photovoltaic solar energy production by more than 35%, when compared to a fixed installation, the press release said. This maximizes profits by reducing the investment in solar panels, the company added.

Mecasolar added it expects to strengthen its presence in Central Europe, stressing that the renewable energy market is expanding, with good prospects for solar energy.

Related Articles

romania INVL Renewable Energy Fund Kommunalkredit

INVL fund secures loan for 71 MW of solar projects in Romania

30 July 2025 - INVL Renewable Energy Fund I, managed by INVL Asset Management, invests in renewable energy projects

Price of residential battery storage in Europe drops over 50 in two years

Price of residential battery storage in Europe drops over 50% in two years

30 July 2025 - The mature residential battery storage markets in Europe are stabilizing, while policy-driven and emerging markets are gaining traction

Eximprod 38 4 MW wind farm northeast of Bucharest

Production starts at new 38.4 MW wind farm northeast of Bucharest

30 July 2025 - Eximprod started generating electricity in its new wind farm in Romania's east, while several other projects in the country are near completion

montenegro epcg nte energy norway memorandum bulatovic Inge Forseth

Montenegro’s EPCG, NTE Energy sign memorandum of understanding

30 July 2025 - The memorandum of understanding confirms mutual commitment to intensifying cooperation in the renewable energy sector in Montenegro