Balkan Green Energy News
EN SR
Subscribe
  • Home
  • Renewables
    • Biomass & Biogas
    • Geothermal
    • Solar
    • Solar thermal
    • Wind
    • Hydropower
  • Electricity
  • Energy Efficiency
  • Grids
  • Environment and Climate
    • Biodiversity
    • Climate Change
    • Pollution
    • Waste
    • Water
  • Energy Storage
  • Hydrogen
  • Nuclear
  • Fossil fuels
    • Coal
    • Gas
    • Oil
  • Digitalisation and AI
  • Features
  • Interviews
Trending:

Albania, US-Based Argent LNG plan to build liquefied natural gas terminal

Masdar, Taaleri create largest Western Balkans wind hub with Čibuk 2 launch

Alcazar secures EUR 180 million for first phase of 396 MW wind farm in North Macedonia

Hidroelectrica picks contractor for BESS at Iron Gates II hydropower plant

Girişim Elektrik to install two solar plants for state power utility of BiH

Christof Lessenich appointed new director of EU energy agency ACER

Montenegro, Japan seal energy partnership

NGEN commissions largest battery storage system in Austria

Fortis Energy orders solar mounting systems from Schletter Group

Illegally dumped waste from Croatia to be incinerated at Holcim, Nexe cement plants

Greece’s IPTO set to connect over 10 GW of renewables by 2035

Three official bids submitted for first wind auction in Kosovo*

Serbia, Masdar weigh large-scale BESS projects

Slovenia to integrate hydrogen into power, gas networks in cooperation with Japan’s Yokogawa

BiH maps 48 priority environmental hotspots

Colić: Renewable energy projects in Serbia jeopardized

Greensmalt to build Romania’s second solar panel recycling plant in Seini

Powering grid resilience: Enexus selects LONGi’s BESS solutions for key utility projects in Romania

EU Parliament backs expanding CBAM to steel, aluminium end goods

Slovenia scraps electric vehicle subsidies 

Albania, US-Based Argent LNG plan to build liquefied natural gas terminal

Masdar, Taaleri create largest Western Balkans wind hub with Čibuk 2 launch

Alcazar secures EUR 180 million for first phase of 396 MW wind farm in North Macedonia

Hidroelectrica picks contractor for BESS at Iron Gates II hydropower plant

Girişim Elektrik to install two solar plants for state power utility of BiH

Christof Lessenich appointed new director of EU energy agency ACER

Montenegro, Japan seal energy partnership

NGEN commissions largest battery storage system in Austria

Fortis Energy orders solar mounting systems from Schletter Group

Illegally dumped waste from Croatia to be incinerated at Holcim, Nexe cement plants

Greece’s IPTO set to connect over 10 GW of renewables by 2035

Three official bids submitted for first wind auction in Kosovo*

Serbia, Masdar weigh large-scale BESS projects

Slovenia to integrate hydrogen into power, gas networks in cooperation with Japan’s Yokogawa

BiH maps 48 priority environmental hotspots

Colić: Renewable energy projects in Serbia jeopardized

Greensmalt to build Romania’s second solar panel recycling plant in Seini

Powering grid resilience: Enexus selects LONGi’s BESS solutions for key utility projects in Romania

EU Parliament backs expanding CBAM to steel, aluminium end goods

Slovenia scraps electric vehicle subsidies 

Balkan Green Energy News
EN SR
  • Home
  • Renewables
    • Biomass & Biogas
    • Geothermal
    • Solar
    • Solar thermal
    • Wind
    • Hydropower
  • Electricity
  • Energy Efficiency
  • Grids
  • Environment and Climate
    • Biodiversity
    • Climate Change
    • Pollution
    • Waste
    • Water
  • Energy Storage
  • Hydrogen
  • Nuclear
  • Fossil fuels
    • Coal
    • Gas
    • Oil
  • Digitalisation and AI
  • Features
  • Interviews
  • Events
  • GIZ
  • Jobs
Follow Us
Trending:

Albania, US-Based Argent LNG plan to build liquefied natural gas terminal

Masdar, Taaleri create largest Western Balkans wind hub with Čibuk 2 launch

Alcazar secures EUR 180 million for first phase of 396 MW wind farm in North Macedonia

Hidroelectrica picks contractor for BESS at Iron Gates II hydropower plant

Girişim Elektrik to install two solar plants for state power utility of BiH

Christof Lessenich appointed new director of EU energy agency ACER

Montenegro, Japan seal energy partnership

NGEN commissions largest battery storage system in Austria

Fortis Energy orders solar mounting systems from Schletter Group

Illegally dumped waste from Croatia to be incinerated at Holcim, Nexe cement plants

Greece’s IPTO set to connect over 10 GW of renewables by 2035

Three official bids submitted for first wind auction in Kosovo*

Serbia, Masdar weigh large-scale BESS projects

Slovenia to integrate hydrogen into power, gas networks in cooperation with Japan’s Yokogawa

BiH maps 48 priority environmental hotspots

Colić: Renewable energy projects in Serbia jeopardized

Greensmalt to build Romania’s second solar panel recycling plant in Seini

Powering grid resilience: Enexus selects LONGi’s BESS solutions for key utility projects in Romania

EU Parliament backs expanding CBAM to steel, aluminium end goods

Slovenia scraps electric vehicle subsidies 

Albania, US-Based Argent LNG plan to build liquefied natural gas terminal

Masdar, Taaleri create largest Western Balkans wind hub with Čibuk 2 launch

Alcazar secures EUR 180 million for first phase of 396 MW wind farm in North Macedonia

Hidroelectrica picks contractor for BESS at Iron Gates II hydropower plant

Girişim Elektrik to install two solar plants for state power utility of BiH

Christof Lessenich appointed new director of EU energy agency ACER

Montenegro, Japan seal energy partnership

NGEN commissions largest battery storage system in Austria

Fortis Energy orders solar mounting systems from Schletter Group

Illegally dumped waste from Croatia to be incinerated at Holcim, Nexe cement plants

Greece’s IPTO set to connect over 10 GW of renewables by 2035

Three official bids submitted for first wind auction in Kosovo*

Serbia, Masdar weigh large-scale BESS projects

Slovenia to integrate hydrogen into power, gas networks in cooperation with Japan’s Yokogawa

BiH maps 48 priority environmental hotspots

Colić: Renewable energy projects in Serbia jeopardized

Greensmalt to build Romania’s second solar panel recycling plant in Seini

Powering grid resilience: Enexus selects LONGi’s BESS solutions for key utility projects in Romania

EU Parliament backs expanding CBAM to steel, aluminium end goods

Slovenia scraps electric vehicle subsidies 

hybrid power plants

Simtel Team battery contract in Romania OMV Petrom first large solar park

Simtel Team gets battery contract in Romania for OMV Petrom’s first large solar park

A battery energy storage system is due to be installed at the Ișalnița solar farm, wholly owned by OMV Petrom, which awarded the contract to Simtel Team

Energy Storage
Romania
September 17, 2026
Powering grid resilience Enexus selects LONGi BESS solutions for key utility projects in Romania

Powering grid resilience: Enexus selects LONGi’s BESS solutions for key utility projects in Romania

Expanding a 200 MW solar collaboration into integrated storage, Enexus selected LONGi’s liquid-cooled BESS system and high-efficiency PV modules for key grid-balancing projects in Titu

Energy Storage
Romania
September 16, 2026
Fortis Energy orders solar mounting systems from Schletter Group

Fortis Energy orders solar mounting systems from Schletter Group

Fortis Energy is sourcing photovoltaic mounting systems from Schletter Group to cover more than 300 MW in solar-plus-storage projects in Europe

Solar
Albania Region/EU Serbia
September 14, 2026
Journey Ahead JA Roadshow 2026

Journey Ahead: JA Roadshow 2026 – integrated solar and storage solutions for European grid resilience

JA, a global green technology supplier, is organizing Journey Ahead: JA Roadshow 2026 to bring its expanding PV and energy storage portfolio directly to customers

Solar
Region/EU
September 1, 2026
Incentives batteries Romania Bolojan solar power accompanied by storage

Incentives for batteries underway in Romania as Bolojan says solar power must be accompanied by storage

Romania is launching two BESS support programs. Acting Prime Minister Ilie Bolojan argued batteries should be mandatory for future prosumers.

Energy Storage
Romania
August 20, 2026
Nu Energy grid connection contract Montenegro Velestovo solar power project

Nu Energy signs grid connection contract in Montenegro for Velestovo solar power project

Montenegro's CGES and renewable energy developer Nu Energy signed a grid connection contract for the Velestovo photovoltaic project

Solar
Montenegro
August 19, 2026
Energy water crisis spreads as Danube region is clinging on power imports

Energy, water crisis spreads as Danube region is clinging on power imports

The downstream Danube region is increasingly depending on electricity imports and interconnections, while leaning on solar power and energy storage on the home front.

Energy Crisis
Region/EU
August 4, 2026
Eksim Energy bolstering its wind parks in Turkey with solar power

Eksim Energy bolstering its wind parks in Turkey with solar power

Turkish company Eksim Energy completed the hybridization of two of its wind power plants with photovoltaics, while integrating solar power with two more such facilities.

Renewables
Turkey
August 3, 2026
  • 1
  • 2
  • 3
  • ...
  • 32
Stay ahead in energy

Get weekly updates from Southeast Europe

Subscribe
Balkan Green Energy News
Follow Us
Stay ahead in energy

Get weekly updates from Southeast Europe.

Subscribe
Category
  • Home
  • Renewables
  • Electricity
  • Energy Efficiency
  • Grids
  • Environment and Climate
  • Energy Storage
  • Hydrogen
  • Nuclear
  • Fossil fuels
  • Digitalisation and AI
  • Features
  • Interviews
Company
  • Subscribe
  • Contact
  • Advertising
  • About Us
  • Disclaimer
Follow Us
  • Privacy Policy
  • Cookies

© 2026 Balkan Green Energy News All rights reserved. Developed by Cubes