Renewables

Hidroelectrica, Masdar to set up joint venture for 2 GW in Romania

Hidroelectrica Masdar joint venture 2 GW Romania

Photo: Sebastian Burduja / Facebook

Published

April 19, 2024

Country

Comments

comments icon

0

Share

Published:

April 19, 2024

Country:

Comments:

comments icon

0

Share

The joint venture partnership between Romanian hydropower plant operator Hidroelectrica and Masdar from the UAE is taking shape. They agreed to establish a company to invest more than EUR 1.5 billion in the next three years in photovoltaic plants, floating solar power systems on dam reservoirs and battery storage.

Prime Minister of Romania Marcel Ciolacu visited Abu Dhabi with a group of ministers and the leadership of several state institutions and government-controlled companies. Building on a joint venture partnership established a year ago, Hidroelectrica and Abu Dhabi Future Energy Co. – Masdar agreed to launch investments of more than EUR 1.5 billion in solar power and battery energy storage systems, Minister of Energy Sebastian Burduja said.

The two companies decided to develop both onshore and floating solar power projects together, according to the Romanian state-owned hydropower plant operator. Hidroelectrica revealed that the partnership with Masdar became exclusive, for at least three years.

It can be extended if, within the period, the joint venture proposes final investment decisions (FID) for a total of at least 2 GW in greenfield or brownfield projects, the Romanian utility added. Burduja said the firm would be registered by the end of June.

First joint investment to be in floating power plants on Olt river

Additionally, the partners agreed they can explore opportunities in the onshore and offshore wind power segments as well as outside Romania.

President of the Board of Hidroelectrica Károly Borbély, who led its delegation, said the joint venture would be equally owned and that the first investment with Masdar would be in a pilot project for floating solar power plants on seven reservoirs in the middle and downstream sections of the Olt river.

Hidroelectrica has 187 hydropower plants with 6.3 GW in combined capacity. It also operates the 108 MW Crucea wind farm. The utility said it holds a 13.1% share in power supply in Romania.

Masdar to participate in Belgrade Energy Forum

Masdar is owned by Abu Dhabi National Energy Co. (Taqa), Mubadala Investment Co. (Mubadala) and Abu Dhabi National Oil Co. (Adnoc). It has almost 15 GW worldwide in green energy facilities in operation and development.

The company is scheduled to participate in the upcoming Belgrade Energy Forum 2024 on May 13-14 in Serbia’s capital. In Southeastern Europe, Masdar is also active through the Masdar Taaleri joint venture. It won a market premium in August for its Čibuk 2 project in Serbia at the country’s first wind power auction.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Emblematic Ag. Dimitrios lignite plant shuts down today in Greece

Ag. Dimitrios shutdown today leaves Greece with last coal plant

15 May 2026 - Today is the last day of operation of the Agios Dimitrios thermoelectric station, Greece's largest lignite-fired facility

Japan PowerX battery investments EPCG factory Montenegro

Japan-based PowerX eyes battery investments with EPCG, factory in Montenegro

14 May 2026 - PowerX from western Japan signed a deal with Montenegro's state-owned EPCG on planning 500 MWh of battery storage in the Balkan country

EVN Macedonia BESS 10 MW into operation at solar park

EVN Macedonia puts BESS of 10 MW into operation at its solar park

13 May 2026 - EVN Macedonia commissioned a battery energy storage system within its Probištip photovoltaic plant in North Macedonia

Energy companies confront dual mandate keeping supply secure while accelerating green transition BEF 2026

Energy companies in Western Balkans confront dual mandate – keeping supply secure while accelerating green transition

13 May 2026 - Companies in the region have challenges in energy security, decarbonization and digitalization, and the key is investing in production, the grid and batteries, according to the panel on power system transition at Belgrade Energy Forum 2026