{"id":85263,"date":"2025-10-06T13:52:29","date_gmt":"2025-10-06T11:52:29","guid":{"rendered":"https:\/\/balkangreenenergynews.com\/rs\/?p=85263"},"modified":"2026-06-03T14:35:56","modified_gmt":"2026-06-03T12:35:56","slug":"gridflex-planira-da-instalira-samostalnu-bateriju-kod-leskovca","status":"publish","type":"post","link":"https:\/\/balkangreenenergynews.com\/rs\/gridflex-planira-da-instalira-samostalnu-bateriju-kod-leskovca\/","title":{"rendered":"GridFlex planira da instalira samostalnu bateriju kod Leskovca"},"content":{"rendered":"<h2>Firma GridFlex planira da kod Leskovca instalira samostalnu bateriju snage 125 megavat-sati i investira 17 miliona evra.<\/h2>\n<p>Srbija nema nijednu bateriju velike snage, ali je dosta projekata u razvoju. GridFlex je jedna od <a href=\"https:\/\/balkangreenenergynews.com\/rs\/u-srbiji-u-proceduri-prikljucenja-na-prenosnu-mrezu-baterije-kapaciteta-5-900-mwh\/\">11 firmi koje su u proceduri priklju\u010denja<\/a> samostalnih baterija na prenosnu mre\u017eu, kojom upravlja Elektromre\u017ea Srbije (EMS).<\/p>\n<p>Grad Leskovac je saop\u0161tio da se gradona\u010delnik Goran Cvetanovi\u0107 sastao sa predstavnicima turske kompanije GridFlex, koja svoje sedi\u0161te ima i u Beogradu.<\/p>\n<blockquote><p>Baterijski sistem obezbe\u0111uje fleksibilnost sistema<\/p><\/blockquote>\n<p>Kompanija, kako je navedeno, razvija kontejnerski baterijski sistem za skladi\u0161tenje energije, koji obezbe\u0111uje fleksibilnost sistema, podr\u017eava integraciju obnovljivih izvora energije i doprinosi lokalnoj ekonomiji.<\/p>\n<p>GridFlex planira da investira 17 miliona evra u izgradnju postrojenja za skladi\u0161tenje elektri\u010dne energije u Leskovcu, istakle su gradske vlasti.<\/p>\n<p>Sastanku je prisustvovao, kako je navedeno, vlasnik i direktor kompanije GridFlex Alkin Yaman.<\/p>\n<blockquote><p>Rok za zavr\u0161etak radova na izgradnji postrojenja je kraj 2026.<\/p><\/blockquote>\n<p>U toku je izrada planske i projektno-tehni\u010dke dokumentacije. Rok za zavr\u0161etak radova na izgradnji postrojenja je kraj 2026. godine, dok se pu\u0161tanje u rad o\u010dekuje po\u010detkom 2027. godine, naveo je Grad.<\/p>\n<p>Baterija \u0107e biti instalirana na prostoru od 1,5 hektara kupljenog privatnog zelji\u0161ta, na lokaciji u blizini Trafo stanice Leskovac 2, na prostoru izme\u0111u starog grdeli\u010dkog i vlasotina\u010dkog puta.<\/p>\n<p>Grad Leskovac \u0107e kompaniji GridFlex u narednom periodu pru\u017eiti efikasnu &#8222;koordinaciju u planiranju, komunalnim uslovima i saobra\u0107aju&#8220;.<\/p>\n<h3>Tri vlasnika<\/h3>\n<p>Zahvaljuju\u0107i ovom ulaganju, Leskovac \u0107e ostvariti brojne benefite: mogu\u0107nost novih investicija, smanjenje optere\u0107enja i naponske oscilacije elektroenergetskog sistema, \u010dime se direktno pove\u0107avaju kapaciteti za priklju\u010denje na mre\u017eu novih lokalnih potro\u0161a\u010da i proizvo\u0111a\u010da, saop\u0161tio je Grad.<\/p>\n<p>Ina\u010de, prema podacima Agencije za privredne registre, vlasnici firme GridFlex su pomenuti Alkin Sevket Yaman, Sirin Cem i Denis Severinov Karamov.<\/p>\n<p>Kako je Balkan Green Energy News nedavno objavio U Srbiji su u postupku priklju\u010denja na prenosnu mre\u017eu baterijski sistemi instalisane snage 2.021 MW i kapaciteta 5.899 MWh. GridFlex je u grupi 11 zahteva za priklju\u010denje samostanih baterija, dok se razvija i 44 projekata za baterije pridru\u017eene elektranama na obnovljive izvore energije.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>GridFlex je jedna od 11 firmi koje su u proceduri priklju\u010denja samostalnih baterija na prenosnu mre\u017eu, kojom upravlja Elektromre\u017ea Srbije<\/p>\n","protected":false},"author":23,"featured_media":85264,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"GridFlex planira da instalira samostalnu bateriju kod Leskovca","_seopress_titles_desc":"GridFlex je jedna od 11 firmi koje su u proceduri priklju\u010denja samostalnih baterija na prenosnu mre\u017eu, kojom upravlja Elektromre\u017ea Srbije","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"1","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"GridFlex","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[504,1,7459],"tags":[807,7111,7266,7033,2500,165,6297,652,647,2758,3571],"class_list":["post-85263","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-elektricna-energija","category-obnovljivi-izvori-energije","category-skladistenje-energije","tag-baterije","tag-baterijski-sistemi-za-skladistenje-energije","tag-bess","tag-elektromreza","tag-elektromreza-srbije","tag-ems","tag-fleksibilnost","tag-investicije","tag-obnovljivi-izvori-energije","tag-prenosna-mreza","tag-skladistenje-energije","country-srbija"],"acf":[],"_links":{"self":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts\/85263","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/comments?post=85263"}],"version-history":[{"count":1,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts\/85263\/revisions"}],"predecessor-version":[{"id":92800,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts\/85263\/revisions\/92800"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/media\/85264"}],"wp:attachment":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/media?parent=85263"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/categories?post=85263"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/tags?post=85263"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}