{"id":55926,"date":"2023-02-10T13:50:26","date_gmt":"2023-02-10T12:50:26","guid":{"rendered":"https:\/\/balkangreenenergynews.com\/rs\/?p=55926"},"modified":"2023-02-14T09:27:04","modified_gmt":"2023-02-14T08:27:04","slug":"portugalski-greenvolt-razvija-projekte-za-vetroparkove-u-srbiji","status":"publish","type":"post","link":"https:\/\/balkangreenenergynews.com\/rs\/portugalski-greenvolt-razvija-projekte-za-vetroparkove-u-srbiji\/","title":{"rendered":"Portugalski Greenvolt razvija projekte za vetroparkove u Srbiji"},"content":{"rendered":"<h2>Portugalska kompanija za obnovljivu energiju Greenvolt razvija u Srbiji projekte za gradnju dva vetroparka snage 375 MW u op\u0161tini Aleksinac. Kompanija posluje u 16 zemalja Evrope i sveta.<\/h2>\n<p>Vetropark Bradarac, snage 225 MW, i vetropark Mozgovo, snage 150 MW, razvijaju firme WPP Greenwat i WPP Forest Wind, koje su u vlasni\u0161tvu firme V-Ridium registrovane u Poljskoj. V-Ridium je pod kontrolom portugalske kompanije Greenvolt, koja mu je u me\u0111uvremenu, promenila ime u Greenvolt Power. Ina\u010de, V-Ridium u Srbiji razvija i projekat <a href=\"https:\/\/balkangreenenergynews.com\/rs\/poljaci-i-spanci-ce-u-malom-idjosu-graditi-dva-vetroparka\/\">vetroparka Lov\u0107enac<\/a>, u op\u0161tini Mali I\u0111o\u0161.<\/p>\n<p>Op\u0161tina Aleksinac je <a href=\"https:\/\/www.aleksinac.org\/index.php\/obavestenja\">stavila na rani javni uvid<\/a> do 21. marta dva plana detaljne regulacije za izgradnju dve vetroelektrane. Predmet ranog javnog uvida je elaborat za planove kako bi se javnost upoznala sa svrhom izrade tih dokumenata.<\/p>\n<blockquote><p>Aleksinac ima ne\u0161to ve\u0107e energije vetra od prose\u010dnih u Srbiji<\/p><\/blockquote>\n<p>U elaboratima se navodi da se Prema Prostornom planu Republike Srbije teritorija op\u0161tine Aleksinac nalazi u zoni ne\u0161to ve\u0107ih energija vetra od prose\u010dnih u Srbiji, sa intenzitetom na 100 metara visine ve\u0107im od 225 kWh\/m2 u januaru i oko 75-150 kWh\/m2 u julu.<\/p>\n<p>Vetroelektrana Bradarac trebalo bi da bude instalirana na prostoru koji obuhvata oko 2.560 hektara, u okviru katastarskih op\u0161tina \u0106i\u0107ina, Rutevac, Bradarac, Subotinac, Mozgovo i Bovan.<\/p>\n<blockquote><p>Preliminarne projekcije predvi\u0111aju 56 vetrogeneratora<\/p><\/blockquote>\n<p>Plan za vetroelektranu Mozgovo obuhvata 1.985 hektara u okviru katastarskih op\u0161tina Mozgovo i Bovan.<\/p>\n<p>Snaga od 225 MW za Bradarac, kao i 150 MW za Mozgovo, je, kako se navodi, definisana u skladu sa mogu\u0107nostima priklju\u010denja na elektroenergetski sistem. Za prvi vetropark su planirane 34 lokacije za vetrogeneratore, a za drugi 22.<\/p>\n<blockquote><p>Greenvolt razvija projekte snage 6,7 GW<\/p><\/blockquote>\n<p>Elaboratima se defini\u0161e mogu\u0107nost fazne realizacije celokupnog projekta i naknadnog odabira tipa vetrogeneratora i njihove pojedina\u010dne snage od \u010dega \u0107e zavisiti ukupan broj vetrogeneratora.<\/p>\n<p>Ina\u010de, vetropark Mozgovo nalazi se na <a href=\"https:\/\/ems.rs\/media\/uploads\/20230206_%D0%BF%D1%80%D0%BE%D0%B8%D0%B7%D0%B2%D0%BE%D1%92%D0%B0%D1%87%D0%B8_%D0%A1%D0%BF%D0%B8%D1%81%D0%B0%D0%BA_%D1%81%D0%B2%D0%B8.pdf\">spisku zahteva za priklju\u010denje<\/a> novih elektrana koji vodi Elektromre\u017ea Srbije (EMS), dok projekat Bradarac nije na njemu.<\/p>\n<p>Kompanija Greenvolt posluje u tri oblasti: proizvodnja energije iz biomase (\u0161est elektrana), razvoj projekata za vetar i solar (6,7 GW) i distribuirana proizvodnja &#8211; razvoj proizvodnje za sopstvenu potro\u0161nju i energetske zajednice.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Vetropark Bradarac, snage 225 MW, i vetropark Mozgovo, snage 150 MW, su u vlasni\u0161tvu firme V-Ridium, koja je registrovana u Poljskoj<\/p>\n","protected":false},"author":23,"featured_media":55928,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"Portugalski Greenvolt razvija projekte za vetroparkove u Srbiji","_seopress_titles_desc":"Vetropark Bradarac, snage 225 MW, i vetropark Mozgovo, snage 150 MW, su u vlasni\u0161tvu firme V-Ridium, koja je registrovana u Poljskoj","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"1","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"Greenvolt","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[504,1],"tags":[6731,652,2341,4891],"class_list":["post-55926","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-elektricna-energija","category-obnovljivi-izvori-energije","tag-greenvolt","tag-investicije","tag-vetroelektrane","tag-vetroparkovi","country-srbija"],"acf":[],"_links":{"self":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts\/55926","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/comments?post=55926"}],"version-history":[{"count":0,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts\/55926\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/media\/55928"}],"wp:attachment":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/media?parent=55926"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/categories?post=55926"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/tags?post=55926"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}