{"id":33154,"date":"2020-08-21T09:44:36","date_gmt":"2020-08-21T07:44:36","guid":{"rendered":"https:\/\/balkangreenenergynews.com\/rs\/?p=33154"},"modified":"2020-08-21T09:44:36","modified_gmt":"2020-08-21T07:44:36","slug":"vlada-slovenije-odobrila-127-miliona-evra-za-zavrsetak-infrastrukture-za-he-brezice","status":"publish","type":"post","link":"https:\/\/balkangreenenergynews.com\/rs\/vlada-slovenije-odobrila-127-miliona-evra-za-zavrsetak-infrastrukture-za-he-brezice\/","title":{"rendered":"Vlada Slovenije odobrila 12,7 miliona evra za zavr\u0161etak infrastrukture za HE Bre\u017eice"},"content":{"rendered":"<h2>Vlada Slovenije odobrila je dodatnih 12,7 miliona evra za zavr\u0161etak infrastrukture za hidroelektranu (HE) Bre\u017eice na reci Savi i produ\u017eila rok za radove do kraja leta 2022. godine.<\/h2>\n<p>Zavr\u0161etak infrastrukture podrazumeva radove koji se ti\u010du za\u0161tite prirode i odbrane od polava na nekoliko pritoka Save.<\/p>\n<p>HE Bre\u017eice, snage 47.4 MW, <a href=\"https:\/\/balkangreenenergynews.com\/rs\/hidroelektrana-brezice-na-savi-svecano-pustena-u-rad\/\">pu\u0161tena je u rad<\/a> 2017. godine, a izgradnja je ko\u0161tala oko 261 milion evra.<\/p>\n<p>Ova hidroelektrana, u vlasni\u0161tvu kompanije Hidroelektrarne na Spodnji Savi (HESS), ima prose\u010dnu godi\u0161nju proizvodnju 161 GWh, navodi se na sajtu HESS.<\/p>\n<blockquote><p>Aktivnosti na otklanjanju posledica izgradnje na \u017eivotnu sredinu jo\u0161 nisu sprovedene<\/p><\/blockquote>\n<p>Tako\u0111e je potrebno oja\u010dati stubove na mostovima preko Save i produbiti re\u010dno korito u zoni hidroelektrane. Slovena\u010dka vlada je saop\u0161tila i da aktivnosti na otklanjanju posledica izgradnje na \u017eivotnu sredinu, koje su tokom monitoringa uticaja na \u017eivotnu sredinu ocenjene kao neodgovaraju\u0107e, jo\u0161 uvek nisu sprovedene.<\/p>\n<p>Sredstva koja je odobrila vlada su tako\u0111e namenjena za otkup ostatka zemlji\u0161ta na kome treba da se izgradi sva neodvr\u0161ena infrastruktura, navodi se u saop\u0161tenju.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Vlada Slovenije odobrila je dodatnih 12,7 miliona evra za zavr\u0161etak infrastrukture za hidroelektranu (HE) Bre\u017eice na reci Savi i produ\u017eila rok za radove do kraja leta 2022. godine. Zavr\u0161etak infrastrukture podrazumeva radove koji se ti\u010du za\u0161tite prirode i odbrane od polava na nekoliko pritoka Save. HE Bre\u017eice, snage 47.4 MW, pu\u0161tena je u rad 2017. [&hellip;]<\/p>\n","protected":false},"author":25,"featured_media":33155,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"Odobreno 12,7 miliona evra za zavr\u0161etak infrastrukture za HE Bre\u017eice","_seopress_titles_desc":"Vlada Slovenije odobrila je dodatnih 12,7 miliona evra za zavr\u0161etak infrastrukture za hidroelektranu (HE) Bre\u017eice na reci Savi.","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"1","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"zavr\u0161etak infrastrukture","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1,4],"tags":[1263,655,1041],"class_list":["post-33154","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-obnovljivi-izvori-energije","category-zivotna-sredina-i-klima","tag-he-brezice","tag-hidroelektrana","tag-hidroenergija","country-slovenija"],"acf":[],"_links":{"self":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts\/33154","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/comments?post=33154"}],"version-history":[{"count":0,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts\/33154\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/media\/33155"}],"wp:attachment":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/media?parent=33154"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/categories?post=33154"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/tags?post=33154"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}