{"id":31864,"date":"2020-07-03T08:58:38","date_gmt":"2020-07-03T06:58:38","guid":{"rendered":"https:\/\/balkangreenenergynews.com\/rs\/?p=31864"},"modified":"2025-10-06T11:53:38","modified_gmt":"2025-10-06T09:53:38","slug":"entso-e-i-kosovski-kostt-potpisali-sporazum-o-povezivanju","status":"publish","type":"post","link":"https:\/\/balkangreenenergynews.com\/rs\/entso-e-i-kosovski-kostt-potpisali-sporazum-o-povezivanju\/","title":{"rendered":"ENTSO-E i kosovski* KOSTT potpisali sporazum o povezivanju"},"content":{"rendered":"<h2>Operator prenosnog sistema KOSTT \u0107e, po\u0161to je evropski ENTSO-E to prihvatio, postati nezavisna kontrolna zona u okviru AK bloka, kojeg je Kosovo* osnovalo s Albanijom.<\/h2>\n<p>Posle odluke Regionalne grupe Kontinentalna Evropa (RGCE) <a href=\"https:\/\/balkangreenenergynews.com\/rs\/kostt-entso-e-izglasao-da-kosovski-prenosni-sistem-ne-bude-pod-kontrolom-ems-a\/\">u aprilu,<\/a> generalni direktor KOSTT-a Ilir Shala je potpisao sporazum o povezivanju s Evropskom mre\u017eom operatora prenosnog sistema elektri\u010dne energije (ENTSO-E). Kosovski* TSO je saop\u0161tio da \u0107e biti nezavisna kontrolna zona u okviru AK bloka s Albanijom, pod sinhronom zonom Kontinentalne Evrope.<\/p>\n<p>Primena se o\u010dekuje na jesen, posle tehni\u010dkih priprema entiteta u Kontinentalnoj Evropi i Swissgrida, a KOSTT je spreman, navedeno je u objavi. Sporazum s Albanijom je postignut pro\u0161le godine.<\/p>\n<h3>Integrisanje EPS-ovog ElektroSevera<\/h3>\n<p>Sporazum uklju\u010duje potpuno osposobljavanje interkonekcije s Albanijom od 400 kilovolti, saop\u0161tio je KOSTT. Ta linija je izgra\u0111ena jo\u0161 2016. godine.<\/p>\n<p>Navedeno je da ElektroSever, koji bi kontrolisao podru\u010dje na severu, mora da podnese zahtev za dozvolu za snabdevanje strujom Regulatornom uredu za energiju (ERO) Kosova*. ElektroSever je ispostava Elektroprivrede Srbije, koja je u dr\u017eavnom vlasni\u0161tvu.<\/p>\n<p>KOSTT \u0107e ubirati prihod izme\u0111u \u010detiri i osam miliona evra godi\u0161nje na ime kori\u0161\u0107enja interkonekcijske prenosne mre\u017ee ili alokacije kapaciteta i re\u0161avanja zagu\u0161enja, i jo\u0161 pola miliona do milion evra za prenos, otkriva se u izjavi za \u0161tampu.<\/p>\n<h3>Pridru\u017eivanje Albanskoj berzi struje<\/h3>\n<p>TSO je objavio da se uparuje s Albanijom i da \u0107e u\u010destvovati u Albanskoj berzi struje (APEX).<\/p>\n<p>Shala je zahvalio ambasadama Nema\u010dke i Sjedinjenih Dr\u017eava, razvojnoj banci KfW i USAID-u. KOSTT je saop\u0161tio da je sporazum korak ka \u010dlanstvu u ENTSO-E-u.<\/p>\n<p>KOSTT je napustio regulatorno podru\u010dje Srbije (EMS) u u bloku SMM, koji \u010dine Srbija, Crna Gora i Severna Makedonija, a za koordinaciju je zadu\u017een srpski TSO Elektromre\u017ea Srbije \u2013 EMS. KOSTT i EMS su <a href=\"https:\/\/balkangreenenergynews.com\/rs\/nemacka-trazi-od-energetske-zajednice-da-pomogne-u-resavanju-spora-izmedu-ems-a-i-kostt-a\/\">u dugogodi\u0161njem sporu,<\/a> koji je u jednom trenutku \u010dak izazvao <a href=\"https:\/\/balkangreenenergynews.com\/rs\/ems-kostt-prekinuo-neovlasceno-povlacenje-elektricne-energije-prestale-devijacije-u-zoni-eu\/\">odstupanje u sistemskoj frekvenci<\/a> u elektroenergetskom sistemu Kontinentalne Evrope.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Operator prenosnog sistema KOSTT \u0107e, po\u0161to je evropski ENTSO-E to prihvatio, postati nezavisna kontrolna zona u okviru AK bloka, kojeg je Kosovo* osnovalo s Albanijom. Posle odluke Regionalne grupe Kontinentalna Evropa (RGCE) u aprilu, generalni direktor KOSTT-a Ilir Shala je potpisao sporazum o povezivanju s Evropskom mre\u017eom operatora prenosnog sistema elektri\u010dne energije (ENTSO-E). Kosovski* TSO [&hellip;]<\/p>\n","protected":false},"author":27,"featured_media":31870,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"ENTSO-E i kosovski* KOSTT potpisali sporazum o povezivanju","_seopress_titles_desc":"Operator prenosnog sistema KOSTT \u0107e, po\u0161to je evropski ENTSO-E to prihvatio, postati nezavisna kontrolna zona u okviru AK bloka \u2013 Kosova* i Albanije.","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"504","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"ENTSO-E KOSTT","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[504],"tags":[3456,669,1307,1413,832,1377],"class_list":["post-31864","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-elektricna-energija","tag-apex","tag-elektricna-energija","tag-elektroprivreda-srbije","tag-entso-e","tag-kostt","tag-operator-prenosnog-sistema","country-kosovo"],"acf":[],"_links":{"self":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts\/31864","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/users\/27"}],"replies":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/comments?post=31864"}],"version-history":[{"count":0,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts\/31864\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/media\/31870"}],"wp:attachment":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/media?parent=31864"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/categories?post=31864"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/tags?post=31864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}