{"id":19157,"date":"2018-09-03T11:22:26","date_gmt":"2018-09-03T09:22:26","guid":{"rendered":"https:\/\/balkangreenenergynews.com\/rs\/?p=19157"},"modified":"2018-09-03T11:39:37","modified_gmt":"2018-09-03T09:39:37","slug":"slovenacki-petrol-pustio-u-rad-mhe-jelec-snage-48-mw-u-bih","status":"publish","type":"post","link":"https:\/\/balkangreenenergynews.com\/rs\/slovenacki-petrol-pustio-u-rad-mhe-jelec-snage-48-mw-u-bih\/","title":{"rendered":"Slovena\u010dki Petrol pustio u rad MHE Jele\u010d snage 4,8 MW u BiH"},"content":{"rendered":"<h2>Slovena\u010dka energetska grupacija Petrol je zvani\u010dno pustila u rad malu hidroelektranu (MHE) Jele\u010d na reci Govza kod Fo\u010de u Bosni i Hercegovini (BiH). Koncesionar je u izgradnju MHE Jele\u010d snage 4,8 MW ulo\u017eio 6,25 miliona evra.<\/h2>\n<p>Planirano je da dve turbine MHE Jele\u010d godi\u0161nje proizvode od 14 do 18 GWh elektri\u010dne energije, \u0161to je dovoljno da se obezbedi snabdevanje strujom 4.000 doma\u0107instava.<\/p>\n<p>https:\/\/vimeo.com\/277489244<\/p>\n<p>Javnosti najpoznatiji kao trgovac naftom i naftnim derivatima i mre\u017ei benzinskih stanica u regionu, Petrol uz MHE Jele\u010d ima i \u010detiri male hidroelektrane u Fojnici u BiH ukupne snage oko 6 MW, kao i vetropark u \u0160ibeniku u Hrvatskoj instalisane snage 20,7 MW. Ukupna godi\u0161nja proizvodnja ovih pogona od oko 80 GWh elektri\u010dne energije dovoljna je za potrebe 20.000 doma\u0107instava.<\/p>\n<p>Na sve\u010danosti povodom otvaranja MHE Jele\u010d, ministar industrije, energetike i rudarstva Republike Srpske Petar \u0110oki\u0107 je podsetio da je u poslednje tri godine u Republici Srpskoj pu\u0161teno u rad oko 20 malih hidroelektrana i dodao da se trenutno gradi jo\u0161 14 MHE.<\/p>\n<p>\u201eIstovremeno, vr\u0161imo pripreme za po\u010detak gradnje velikih energetskih projekata, kao \u0161to je Hidroelektrana Buk Bijela na Drini i nadam se da \u0107emo uskoro biti u situaciji da raspi\u0161emo javni poziv za izbor partnera za njenu gradnju\u201c, rekao je \u0110oki\u0107.<\/p>\n<p>\u010clan Uprave Grupacije Petrol Rok Vodnik izrazio je na sve\u010danosti izrazio uverenje da \u0107e grupacija nastaviti da investira u projekte obnovljivih izvora energije i energetske efikasnosti, navodi se u saop\u0161tenju Vlade Republike Srpske.<\/p>\n<p>Na\u010delnik op\u0161tine Fo\u010da Radisav Ma\u0161i\u0107 rekao je da je ovo \u010detvrta hidrocentrala izgra\u0111ena u poslednje \u010detiri godine na podru\u010dju ove op\u0161tine.<\/p>\n<p>\u201eI od ove male hidroelektrane o\u010dekujemo korist za mje\u0161tane Jele\u010da, lokalnu zajednicu i Republiku Srpsku. Doprine\u0107e pobolj\u0161anju putne infrastrukture i obezbje\u0111enju elektri\u010dne energije, op\u0161tina \u0107e imati koncesionu naknadu, a Srpska nove potencijale u hidroenergetici\u201c, dodao je Ma\u0161i\u0107.<\/p>\n<p>U saop\u0161tenju se tako\u0111e navodi da je Ma\u0161i\u0107 izrazio zadovoljstvo najavljenim projektima gradnje hidroelektrana <a href=\"https:\/\/balkangreenenergynews.com\/rs\/formirana-firma-za-gradnju-buk-bijela\/\">Buk Bijela<\/a>, <a href=\"https:\/\/balkangreenenergynews.com\/rs\/19089-2\/\">Fo\u010da i Paunci<\/a> na reci Drini.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Slovena\u010dka energetska grupacija Petrol je zvani\u010dno pustila u rad malu hidroelektranu (MHE) Jele\u010d na reci Govza kod Fo\u010de u Bosni i Hercegovini (BiH). Koncesionar je u izgradnju MHE Jele\u010d snage 4,8 MW ulo\u017eio 6,25 miliona evra. Planirano je da dve turbine MHE Jele\u010d godi\u0161nje proizvode od 14 do 18 GWh elektri\u010dne energije, \u0161to je dovoljno [&hellip;]<\/p>\n","protected":false},"author":20,"featured_media":19161,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"Slovena\u010dki Petrol pustio u rad MHE Jele\u010d snage 4,8 MW u BiH","_seopress_titles_desc":"Slovena\u010dka energetska grupacija Petrol je zvani\u010dno pustila u rad malu hidroelektranu (MHE) Jele\u010d na reci Govza kod Fo\u010de u Bosni i Hercegovini (BiH). Koncesionar je u izgradnju MHE Jele\u010d snage 4,8 MW ulo\u017eio 6,25 miliona evra.","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"504","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"MHE Jele\u010d","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[504,1],"tags":[1479,1938],"class_list":["post-19157","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-elektricna-energija","category-obnovljivi-izvori-energije","tag-petar-dokic","tag-petrol","country-bosna-i-hercegovina"],"acf":[],"_links":{"self":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts\/19157","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/comments?post=19157"}],"version-history":[{"count":0,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts\/19157\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/media\/19161"}],"wp:attachment":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/media?parent=19157"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/categories?post=19157"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/tags?post=19157"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}