{"id":18259,"date":"2018-07-04T13:25:46","date_gmt":"2018-07-04T11:25:46","guid":{"rendered":"https:\/\/balkangreenenergynews.com\/rs\/?p=18259"},"modified":"2018-07-04T13:30:00","modified_gmt":"2018-07-04T11:30:00","slug":"kostt-potpisao-sporazume-o-prikljucenju-mrezu-lepenci-vetroparka-koznica","status":"publish","type":"post","link":"https:\/\/balkangreenenergynews.com\/rs\/kostt-potpisao-sporazume-o-prikljucenju-mrezu-lepenci-vetroparka-koznica\/","title":{"rendered":"KOSTT potpisao sporazume o priklju\u010denju na mre\u017eu HE Lepenci i vetroparka Koznica"},"content":{"rendered":"<h2>Operator prenosnog sistema Kosova* KOSTT potpisao je sporazume o priklju\u010denju na mre\u017eu hidroelektrane (HE) Lepenci, snage 10 MW, i vetroparka Koznica, snage 34,5 MW, sa predstavnicima ovih proizvo\u0111a\u010da elektri\u010dne energije.<\/h2>\n<p>Sporazumi su u skladu sa ciljevima Energetske strategije za period 2017-2026. koji se odnose na sigurnost snabdevanja elektri\u010dnom energijom i kori\u0161\u0107enje obnovljivih izvora energije (OIE), navodi se u saop\u0161tenju KOSTT.<\/p>\n<p>HE Lepenci se, kako je istakao KOSTT, trenutno gradi u op\u0161tini Hani Elezit, a po\u010detak proizvodnje elektri\u010dne energije se o\u010dekuje do 2020. godine.<\/p>\n<p>Posle obavljene analize, KOSTT je potpisao i sporazum o povezivanju vetroparka Koznica na mre\u017eu. Elektrana c\u0301e biti izgra\u0111ena u op\u0161tini Artana, a po\u010detak proizvodnje planiran je za 2022. godinu, naveo je KOSTT.<\/p>\n<p>Sporazume o priklju\u010denju na mre\u017eu potpisao je direktor KOSTT Ilir Shala.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Operator prenosnog sistema Kosova* KOSTT potpisao je sporazume o priklju\u010denju na mre\u017eu hidroelektrane (HE) Lepenci, snage 10 MW, i vetroparka Koznica, snage 34,5 MW, sa predstavnicima ovih proizvo\u0111a\u010da elektri\u010dne energije. Sporazumi su u skladu sa ciljevima Energetske strategije za period 2017-2026. koji se odnose na sigurnost snabdevanja elektri\u010dnom energijom i kori\u0161\u0107enje obnovljivih izvora energije (OIE), [&hellip;]<\/p>\n","protected":false},"author":23,"featured_media":18264,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"KOSTT potpisao sporazume o priklju\u010denju na mre\u017eu HE Lepenci i vetroparka Koznica","_seopress_titles_desc":"Operator prenosnog sistema Kosova* KOSTT potpisao je sporazume o priklju\u010denju na mre\u017eu hidroelektrane (HE) Lepenci, snage 10 MW, i vetroparka Koznica, snage 34,5 MW, sa predstavnicima ovih proizvo\u0111a\u010da elektri\u010dne energije.","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"1","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"HE Lepenci","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[504,1],"tags":[722,832,719],"class_list":["post-18259","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-elektricna-energija","category-obnovljivi-izvori-energije","tag-tema-hidroelektrana-balkan-green-energy-news","tag-kostt","tag-vetropark","country-kosovo"],"acf":[],"_links":{"self":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts\/18259","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/comments?post=18259"}],"version-history":[{"count":0,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts\/18259\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/media\/18264"}],"wp:attachment":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/media?parent=18259"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/categories?post=18259"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/tags?post=18259"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}