{"id":12840,"date":"2017-06-26T16:01:27","date_gmt":"2017-06-26T14:01:27","guid":{"rendered":"http:\/\/balkangreenenergynews.com\/rs\/?p=12840"},"modified":"2018-12-07T16:06:16","modified_gmt":"2018-12-07T15:06:16","slug":"albanija-primorana-da-uvozi-elektricnu-energiju-zbog-suse","status":"publish","type":"post","link":"https:\/\/balkangreenenergynews.com\/rs\/albanija-primorana-da-uvozi-elektricnu-energiju-zbog-suse\/","title":{"rendered":"Albanija primorana da uvozi elektri\u010dnu energiju zbog su\u0161e"},"content":{"rendered":"<h2>Albanija je pokrenula proceduru uvoza 285.000 MWh elektri\u010dne energije za period od ne\u0161to vi\u0161e od mesec dana kako bi nadoknadila manjak u doma\u0107oj proizvodnji. Manjak je izazvan su\u0161om, odnosno padom vodostaja, pre svega na reci Drim.<\/h2>\n<p>Albanski operator distributivnog sistema elektri\u010dne energije (OSHEE) objavio je 23. juna da je pokrenuo proceduru uvoza 285.000 MWh struje za period od 28. juna do 31. jula.<\/p>\n<p>OSHEE je kao razlog naveo &#8222;gubitke u doma\u0107oj proizvodnji&#8220; izazvane su\u0161om i dodao da \u0107e oko 53 odsto potro\u0161nje struje u Albaniji biti pokriveno energijom iz uvoza, a ostatak iz doma\u0107e proizvodnje.<\/p>\n<p>Prema podacima Albanske elektroprivrede (KESH), nivo vode u akumulacionom jezeru kod brane Fjerza na reci Drim je 15 metara ni\u017ei u odnosu na isti period pro\u0161le godine.<\/p>\n<p>Albanija gotovo 100 odsto elektri\u010dne energije proizvodi u hidrocentralama, a najve\u0107i udeo u proizvodnji imaju tri hidroelektrane (HE) na Drimu.<\/p>\n<p>Na toj najve\u0107oj reci u Albaniji nalaze se HE Fjerza (500 MW), Komani (600 MW) i Vau i Dejes (250 MW). Prema podacima <a href=\"https:\/\/www.hydropower.org\/country-profiles\/albania\">Me\u0111unarodne asocijacije za hidroenergiju<\/a> (IHA), te tri HE \u010dine tri \u010detvrtine ukupnih kapaciteta za proizvodnju elektri\u010dne energije u Albanije i na njih otpada 90 odsto doma\u0107e proizvodnje struje.<\/p>\n<p>Instalisani kapaciteti HE u Albanijie u 2014. godini su iznosili, prema podacima IHA, 1.527 MW, dok je u HE proizvedeno 4,01 TWh struje.<\/p>\n<p>Albansko Ministarstvo energetike i industrije je krajem maja objavilo<a href=\"https:\/\/balkangreenenergynews.com\/rs\/albanija-trapkoncesiju-za-izgradnju-i-eksploataciju-hidrocentrale-kalivac\/\"> tender<\/a> za izgradnju HE Kalivac na reci Vjosi.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Albanija je pokrenula proceduru uvoza 285.000 MWh elektri\u010dne energije za period od ne\u0161to vi\u0161e od mesec dana kako bi nadoknadila manjak u doma\u0107oj proizvodnji. Manjak je izazvan su\u0161om, odnosno padom vodostaja, pre svega na reci Drim. Albanski operator distributivnog sistema elektri\u010dne energije (OSHEE) objavio je 23. juna da je pokrenuo proceduru uvoza 285.000 MWh struje [&hellip;]<\/p>\n","protected":false},"author":25,"featured_media":12843,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_titles_title":"Albanija primorana da uvozi elektri\u010dnu energiju zbog su\u0161e","_seopress_titles_desc":"Albanija je pokrenula proceduru uvoza 285.000 MW elektri\u010dne energije za period od ne\u0161to vi\u0161e od mesec dana kako bi nadoknadila manjak u doma\u0107oj proizvodnji.","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"504","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"Albanija","_seopress_news_disabled":"","_seopress_video_disabled":"","_seopress_video":[],"_seopress_pro_schemas_manual":[],"_seopress_pro_rich_snippets_disable_all":"","_seopress_pro_rich_snippets_disable":[],"_seopress_pro_schemas":[],"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[504],"tags":[669,1202,282,3007,339],"class_list":["post-12840","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-elektricna-energija","tag-elektricna-energija","tag-hidroelektrane","tag-kesh","tag-operator-distributivnog-sistema","tag-oshee","country-albanija"],"acf":[],"_links":{"self":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts\/12840","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/comments?post=12840"}],"version-history":[{"count":0,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/posts\/12840\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/media\/12843"}],"wp:attachment":[{"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/media?parent=12840"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/categories?post=12840"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/balkangreenenergynews.com\/rs\/wp-json\/wp\/v2\/tags?post=12840"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}